Wireless Security Television Monitoring System
Table of Contents
1. Overview 4
2. Applicable Standards and Documents 4
3. Scope of Supply 4
4. System Description 4
4.1 General 4
4.2 Functional Description 5
4.3 CCTV system 6
4.3.1 System Control Unit(SCU) 6
4.3.2 CCTV CAMERA 8
4.3.3 CCTV MONITOR 10
5. Portable Interface Unit Software 11
6. Drawings and Models 12
7. Noise Control Plan 12
8. Vibration and Shock Control Plan 12
9. EMI/EMC Control Plan 13
10. Software Assurance Process 14
11. Reliability and Maintainability Plan 16
12. Safety Plan 16
13. Material Test Data 16
14. Test and Inspection 17
15. Quality Assurance Process 17
1.
Overview
This Technical Proposal applies to the CCTV System that shall be mounted on of Turkey Kayseri Tram.
2. Applicable Standards and Documents
Additionally, Woojin will support Contractor’s complete car post-delivery tests where necessary.
15. Quality Assurance Process
Woojin’s quality assurance process will conform the requirements of ISO 9001:2008. Figure 9 is a copy of ISO 9001:2008 certification of Woojin.
Figure 9 ISO 9001:2008 Certification